Process
Areas
(staged)

Level 2
 
REQM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VER 
 VAL 
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5 
 
OPM 
 CAR

      5. Process Areas
          5.17. Requirements Management
 SG 1 Manage Requirements 
Process AreaREQM
Level2
GoalSG 1

Requirements are managed and inconsistencies with project plans and work products are identified.

The project maintains a current and approved set of requirements over the life of the project by doing the following:

· Managing all changes to requirements

· Maintaining relationships among requirements, project plans, and work products

· Ensuring alignment among requirements, project plans, and work products

· Taking corrective action

Refer to the Requirements Development process area for more information about analyzing and validating requirements.

Refer to the Develop Alternative Solutions and Selection Criteria specific practice in the Technical Solution process area for more information about determining the feasibility of the requirements.

Refer to the Project Monitoring and Control process area for more information about managing corrective action to closure.



Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP  
 OPM

Project
management
 
PP
 PMC 
 REQM 
 
SAM  
 
IPM
 RSKM
 
QPM

Engineering
 
RD 
 TS
 PI
 VER 
 VAL
Support
 
CM
 PPQA
 MA
 
DAR
 CAR