A capability level 1 process is characterized as a performed process. A performed process is a process that accomplishes the needed work to
produce work products; the specific goals of the process area are satisfied.
Although capability level 1 results in important improvements, those improvements can be lost over time if they are not institutionalized. The application of institutionalization (the CMMI generic practices at capability levels 2
and 3) helps to ensure that improvements are maintained.