      5. Process Areas
          5.22. Verification
              SG 2 Perform Peer Reviews
 SP 2.3 Analyze Peer Review Data 
Process AreaVER
Level3
GoalSG 2
PracticeSP 2.3

Analyze data about the preparation, conduct, and results of the peer reviews.

Refer to the Measurement and Analysis process area for more information about obtaining measurement data and analyzing measurement data.

Example Work Products

1.    Peer review data

2.    Peer review action items

Subpractices

1.    Record data related to the preparation, conduct, and results of the peer reviews.

Typical data are product name, product size, composition of the peer review team, type of peer review, preparation time per reviewer, length of the review meeting, number of defects found, type and origin of defect, and so on. Additional information on the work product being peer reviewed can be collected, such as size, development stage, operating modes examined, and requirements being evaluated.

2.    Store the data for future reference and analysis.

3.    Protect the data to ensure that peer review data are not used inappropriately.

Examples of the inappropriate use of peer review data include using data to evaluate the performance of people and using data for attribution.

 

4.    Analyze the peer review data.

Examples of peer review data that can be analyzed include the following:

·       Phase defect was injected

·       Preparation time or rate versus expected time or rate

·       Number of defects versus number expected

·       Types of defects detected

·       Causes of defects

·       Defect resolution impact

·       User stories or case studies associated with a defect

·       The end users and customers who are associated with defects



Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP  
 OPM

Project
management
 
PP
 PMC 
 REQM 
 
SAM  
 
IPM
 RSKM
 
QPM

Engineering
 
RD 
 TS
 PI
 VER 
 VAL
Support
 
CM
 PPQA
 MA
 
DAR
 CAR