Process
Areas
(staged)

Level 2
 
REQM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VER 
 VAL 
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5 
 
OPM 
 CAR

      5. Process Areas
          5.2. Configuration Management
              SG 2 Track and Control Changes
 SP 2.2 Control Configuration Items 
Process AreaCM
Level2
GoalSG 2
PracticeSP 2.2

Control changes to configuration items.

Control is maintained over the configuration of the work product baseline. This control includes tracking the configuration of each configuration item, approving a new configuration if necessary, and updating the baseline.

Example Work Products

1.    Revision history of configuration items

2.    Archives of baselines

Subpractices

1.    Control changes to configuration items throughout the life of the product or service.

2.    Obtain appropriate authorization before changed configuration items are entered into the configuration management system.

For example, authorization can come from the CCB, the project manager, product owner, or the customer.

 

3.    Check in and check out configuration items in the configuration management system for incorporation of changes in a manner that maintains the correctness and integrity of configuration items.

Examples of check-in and check-out steps include the following:

·       Confirming that the revisions are authorized

·       Updating the configuration items

·       Archiving the replaced baseline and retrieving the new baseline

·       Commenting on the changes made to the item

·       Tying changes to related work products such as requirements, user stories, and tests

 

4.    Perform reviews to ensure that changes have not caused unintended effects on the baselines (e.g., ensure that changes have not compromised the safety or security of the system).

5.    Record changes to configuration items and reasons for changes as appropriate.

If a proposed change to the work product is accepted, a schedule is identified for incorporating the change into the work product and other affected areas.

Configuration control mechanisms can be tailored to categories of changes. For example, the approval considerations could be less stringent for component changes that do not affect other components.

Changed configuration items are released after review and approval of configuration changes. Changes are not official until they are released.



Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP  
 OPM

Project
management
 
PP
 PMC 
 REQM 
 
SAM  
 
IPM
 RSKM
 
QPM

Engineering
 
RD 
 TS
 PI
 VER 
 VAL
Support
 
CM
 PPQA
 MA
 
DAR
 CAR