Process
Areas
(staged)

Level 2  
 AM 
 ARD
 CM
 MA 
 PP
 PMC 
 PPQA 
 REQM 
 SSAD
Level 3 
 ATM
 AVAL
 AVER
 DAR
 IPM 
 OPD 
 
OPF 
 OT 
 RSKM
Level 4
 
OPP
 QPM
Level 5 
 
OPM 
 CAR

      4. Process Areas
          4.15. Organizational Training
              SG 2 Provide Training
 SP 2.3 Assess Training Effectiveness 
Process AreaOT
Level3
GoalSG 2
PracticeSP 2.3

Assess the effectiveness of the organization’s training program.

A process should exist to determine the effectiveness of training (i.e., how well training is meeting the organization’s needs).

Examples of methods used to assess training effectiveness include the following:

·         Testing in the training context

·         Post-training surveys of training participants

·         Surveys of manager satisfaction with post-training effects

·         Assessment mechanisms embedded in courseware

 

Measures can be taken to assess the benefits of training against both the project’s and organization’s objectives. Particular attention should be paid to the need for various training methods, such as training teams as integral work units. When used, work or process performance objectives should be unambiguous, observable, verifiable, and shared with course participants. The results of the training effectiveness assessment should be used to revise training materials as described in the Establish a Training Capability specific practice.

Example Work Products

1.    Training effectiveness surveys

2.    Training program performance assessments

3.    Instructor evaluation forms

4.    Training examinations

Subpractices

1.    Assess in-progress or completed projects to determine whether staff knowledge is adequate for performing project tasks.

2.    Provide a mechanism for assessing the effectiveness of each training course with respect to established organizational, project, or individual learning (or performance) objectives.

3.    Obtain student evaluations of how well training activities met their needs.



Process
Areas
(continuous)


Process
management   
 OPD
 OPF 
 OT  
 
OPP  
 OPM
Project
management  
 AM
 IPM
 
PP
 PMC 
 REQM
 
RSKM
 QPM
 SSAD
Acquisition Engineering 
 ARD

 ATM
 
 AVAL
 AVER

  
Support 
 CAR 
 
CM 
 DAR 
 MA
 
PPQA