Process
Areas
(staged)

Level 2  
 AM 
 ARD
 CM
 MA 
 PP
 PMC 
 PPQA 
 REQM 
 SSAD
Level 3 
 ATM
 AVAL
 AVER
 DAR
 IPM 
 OPD 
 
OPF 
 OT 
 RSKM
Level 4
 
OPP
 QPM
Level 5 
 
OPM 
 CAR

      4. Process Areas
          4.2. Acquisition Requirements Development
 SG 3 Analyze and Validate Requirements 
Process AreaARD
Level2
GoalSG 3

Requirements are analyzed and validated.

Analyses are performed to determine the impact the intended operational environment will have on the ability to satisfy stakeholder needs, expectations, constraints, and interfaces. Considerations such as feasibility, mission needs, cost constraints, potential market size, and acquisition strategy should all be taken into account, depending on the product context.

The objectives of these analyses are (1) to determine candidate requirements for product concepts that will satisfy stakeholder needs, expectations, constraints, and interfaces and (2) to translate these concepts into requirements. In parallel with these activities, the parameters to be used to evaluate the effectiveness of the product are determined based on customer input and the preliminary product concept.

Requirements are validated to increase the probability that the resulting product will perform as intended in the acquirer’s intended environment.



Process
Areas
(continuous)


Process
management   
 OPD
 OPF 
 OT  
 
OPP  
 OPM
Project
management  
 AM
 IPM
 
PP
 PMC 
 REQM
 
RSKM
 QPM
 SSAD
Acquisition Engineering 
 ARD

 ATM
 
 AVAL
 AVER

  
Support 
 CAR 
 
CM 
 DAR 
 MA
 
PPQA